Gexa Energy Best for Green Energy

Gexa Energy in Santa Maria

Gexa Energy in Santa Maria.

Gexa Energy has 6 plans live on the Oncor grid serving Santa Maria. Lowest rate 7.60¢/kWh — about 7.1¢ below the Santa Maria average.

4.1 Oncor grid Cameron County

Gexa Energy in Santa Maria

By the numbers.

Lowest here
7.60¢
Gexa Energy in Santa Maria
Santa Maria avg
14.72¢
across all providers
Gexa Energy plans
6
on Oncor
100% green
6
renewable plans

What you actually pay in Santa Maria

Energy charge vs the wires.

Gexa Energy's cheapest plan in Santa Maria is 7.6¢/kWh all-in. That number is two parts: Gexa Energy's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.

Gexa Energy energy
3.4¢
Oncor delivery
4.2¢
All-in
7.6¢

At a typical 1,000 kWh month, that's about $76 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Santa Maria is the energy charge. Gexa Energy's best rate ranks #7 of 18 providers on the Oncor grid.

Top Gexa Energy picks for Santa Maria

Best Gexa Energy plans here.

1
Gexa Energy
Gexa Energy

Eco Saver Plus 12

100% green
Rate
7.60¢
Term
12 Months
$1000 kWh
$76

Rates as of July 2026 · verify on the EFL

  • 100% green energy
  • $125 bill credit when your usage is at least 1000kWh
  • 60 Day Happiness Guarantee
View plan →
2
Gexa Energy
Gexa Energy

Eco Saver Value 12

100% green
Rate
14.40¢
Term
12 Months
$1000 kWh
$144

Rates as of July 2026 · verify on the EFL

  • 100% green energy
  • $75 bill credit when your usage is at least 750kWh
  • 60 Day Happiness Guarantee
View plan →
3
Gexa Energy
Gexa Energy

Gexa Light Saver 12

100% green
Rate
16.00¢
Term
12 Months
$1000 kWh
$160

Rates as of July 2026 · verify on the EFL

  • 100% green energy
  • Clean energy at a fixed rate
  • Eco-friendly power for your home
View plan →

Every Gexa Energy plan on Oncor

All 6 Gexa Energy plans in Santa Maria.

# Plan Rate
1 Eco Saver Plus 12 7.60¢ View →
2 Eco Saver Value 12 14.40¢ View →
3 Gexa Light Saver 12 16.00¢ View →
4 Eco Saver Lite 12 18.00¢ View →
5 Eco Saver Advantage 12 18.20¢ View →
6 Eco Saver Premier 12 18.60¢ View →

Santa Maria, Cameron County, sample ZIP 78592. Served by Oncor (outage line: 1-888-313-4747).

Switching in Santa Maria

Same wires — new bill from Gexa Energy.

Oncor owns the wires in Santa Maria and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Gexa Energy files the switch on your behalf. Same-day if you order before 4-5 PM Central.

Gexa Energy in Santa Maria — FAQ

Common questions.

Does Gexa Energy serve Santa Maria, TX?
Yes. Gexa Energy offers 6 plans in Santa Maria on the Oncor grid, starting at 7.6¢/kWh all-in. Enrollment is online and service is delivered by Oncor.
What's the delivery charge in Santa Maria?
Oncor charges about 4.2¢/kWh plus ~$3.42/month to deliver power in Santa Maria. This is set by the PUCT and is identical on every plan — from Gexa Energy or any other provider — so the only number that actually differs between providers is the energy charge.
Where does Gexa Energy rank on price in Santa Maria?
Gexa Energy's lowest Santa Maria rate ranks #7 of 18 providers serving the Oncor grid. The cheapest plan overall in Santa Maria is 7.1¢/kWh; Gexa Energy's best is 7.6¢/kWh.
How long does it take to switch to Gexa Energy in Santa Maria?
1 to 3 business days. Oncor keeps delivering power the whole time — no interruption, no new meter, no truck roll. Order before roughly 4–5 PM Central on a weekday and same-day switching is usually available.

Compare Gexa Energy plans in Santa Maria

See how Gexa Energy's 6 plans stack up at your real Santa Maria usage.

No spam · It's free · Takes 60 seconds

How enrollment works

You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.