12 Month (No Min Usage Fee)
Rates as of July 2026 · verify on the EFL
- ✓ 30% green
Constellation in Rowena
Constellation has 3 plans live on the Oncor grid serving Rowena. Lowest rate 14.30¢/kWh.
Constellation in Rowena
What you actually pay in Rowena
Constellation's cheapest plan in Rowena is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.
At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Rowena is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.
Top Constellation picks for Rowena
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Rowena, Runnels County, sample ZIP 76875. Served by Oncor (outage line: 1-888-313-4747).
Switching in Rowena
Oncor owns the wires in Rowena and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.
Constellation in Rowena — FAQ
More on Constellation
See how Constellation's 3 plans stack up at your real Rowena usage.
How enrollment works
You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.