12 Month (No Min Usage Fee)
Rates as of July 2026 · verify on the EFL
- ✓ 30% green
Constellation in Progreso Lakes
Constellation has 3 plans live on the Oncor grid serving Progreso Lakes. Lowest rate 14.30¢/kWh.
Constellation in Progreso Lakes
What you actually pay in Progreso Lakes
Constellation's cheapest plan in Progreso Lakes is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.
At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Progreso Lakes is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.
Top Constellation picks for Progreso Lakes
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Progreso Lakes, Hidalgo County, sample ZIP 78579. Served by Oncor (outage line: 1-888-313-4747).
Switching in Progreso Lakes
Oncor owns the wires in Progreso Lakes and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.
Constellation in Progreso Lakes — FAQ
More on Constellation
See how Constellation's 3 plans stack up at your real Progreso Lakes usage.
How enrollment works
You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.