Constellation Best for Reliability

Constellation in Mertzon

Constellation in Mertzon.

Constellation has 3 plans live on the Oncor grid serving Mertzon. Lowest rate 14.30¢/kWh.

3.9 Oncor grid Irion County

Constellation in Mertzon

By the numbers.

Lowest here
14.30¢
Constellation in Mertzon
Mertzon avg
14.72¢
across all providers
Constellation plans
3
on Oncor
100% green
0
renewable plans

What you actually pay in Mertzon

Energy charge vs the wires.

Constellation's cheapest plan in Mertzon is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.

Constellation energy
10.1¢
Oncor delivery
4.2¢
All-in
14.3¢

At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Mertzon is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.

Top Constellation picks for Mertzon

Best Constellation plans here.

1
Constellation
Constellation

12 Month (No Min Usage Fee)

Rate
14.30¢
Term
12 Months
$1000 kWh
$143

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →
2
Constellation
Constellation

12 Month GREEN (No Min Usage Fee)

Rate
15.30¢
Term
12 Months
$1000 kWh
$153

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →
3
Constellation
Constellation

12Mo Usage Bill Credit + A/C Protection for 2 Units and HVAC Monitoring

Rate
15.30¢
Term
12 Months
$1000 kWh
$153

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →

Mertzon, Irion County, sample ZIP 76941. Served by Oncor (outage line: 1-888-313-4747).

Switching in Mertzon

Same wires — new bill from Constellation.

Oncor owns the wires in Mertzon and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.

Constellation in Mertzon — FAQ

Common questions.

Does Constellation serve Mertzon, TX?
Yes. Constellation offers 3 plans in Mertzon on the Oncor grid, starting at 14.3¢/kWh all-in. Enrollment is online and service is delivered by Oncor.
What's the delivery charge in Mertzon?
Oncor charges about 4.2¢/kWh plus ~$3.42/month to deliver power in Mertzon. This is set by the PUCT and is identical on every plan — from Constellation or any other provider — so the only number that actually differs between providers is the energy charge.
Where does Constellation rank on price in Mertzon?
Constellation's lowest Mertzon rate ranks #12 of 18 providers serving the Oncor grid. The cheapest plan overall in Mertzon is 7.1¢/kWh; Constellation's best is 14.3¢/kWh.
How long does it take to switch to Constellation in Mertzon?
1 to 3 business days. Oncor keeps delivering power the whole time — no interruption, no new meter, no truck roll. Order before roughly 4–5 PM Central on a weekday and same-day switching is usually available.

Compare Constellation plans in Mertzon

See how Constellation's 3 plans stack up at your real Mertzon usage.

No spam · It's free · Takes 60 seconds

How enrollment works

You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.