12 Month (No Min Usage Fee)
Rates as of July 2026 · verify on the EFL
- ✓ 30% green
Constellation in Lorena
Constellation has 3 plans live on the Oncor grid serving Lorena. Lowest rate 14.30¢/kWh.
Constellation in Lorena
What you actually pay in Lorena
Constellation's cheapest plan in Lorena is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.
At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Lorena is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.
Top Constellation picks for Lorena
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Lorena, McLennan County, sample ZIP 76655. Served by Oncor (outage line: 1-888-313-4747).
Switching in Lorena
Oncor owns the wires in Lorena and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.
Constellation in Lorena — FAQ
More on Constellation
See how Constellation's 3 plans stack up at your real Lorena usage.
How enrollment works
You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.