Constellation Best for Reliability

Constellation in Granjeno

Constellation in Granjeno.

Constellation has 3 plans live on the Oncor grid serving Granjeno. Lowest rate 14.30¢/kWh.

3.9 Oncor grid Hidalgo County

Constellation in Granjeno

By the numbers.

Lowest here
14.30¢
Constellation in Granjeno
Granjeno avg
14.72¢
across all providers
Constellation plans
3
on Oncor
100% green
0
renewable plans

What you actually pay in Granjeno

Energy charge vs the wires.

Constellation's cheapest plan in Granjeno is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.

Constellation energy
10.1¢
Oncor delivery
4.2¢
All-in
14.3¢

At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Granjeno is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.

Top Constellation picks for Granjeno

Best Constellation plans here.

1
Constellation
Constellation

12 Month (No Min Usage Fee)

Rate
14.30¢
Term
12 Months
$1000 kWh
$143

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →
2
Constellation
Constellation

12 Month GREEN (No Min Usage Fee)

Rate
15.30¢
Term
12 Months
$1000 kWh
$153

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →
3
Constellation
Constellation

12Mo Usage Bill Credit + A/C Protection for 2 Units and HVAC Monitoring

Rate
15.30¢
Term
12 Months
$1000 kWh
$153

Rates as of July 2026 · verify on the EFL

  • 30% green
View plan →

Granjeno, Hidalgo County, sample ZIP 78572. Served by Oncor (outage line: 1-888-313-4747).

Switching in Granjeno

Same wires — new bill from Constellation.

Oncor owns the wires in Granjeno and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.

Constellation in Granjeno — FAQ

Common questions.

Does Constellation serve Granjeno, TX?
Yes. Constellation offers 3 plans in Granjeno on the Oncor grid, starting at 14.3¢/kWh all-in. Enrollment is online and service is delivered by Oncor.
What's the delivery charge in Granjeno?
Oncor charges about 4.2¢/kWh plus ~$3.42/month to deliver power in Granjeno. This is set by the PUCT and is identical on every plan — from Constellation or any other provider — so the only number that actually differs between providers is the energy charge.
Where does Constellation rank on price in Granjeno?
Constellation's lowest Granjeno rate ranks #12 of 18 providers serving the Oncor grid. The cheapest plan overall in Granjeno is 7.1¢/kWh; Constellation's best is 14.3¢/kWh.
How long does it take to switch to Constellation in Granjeno?
1 to 3 business days. Oncor keeps delivering power the whole time — no interruption, no new meter, no truck roll. Order before roughly 4–5 PM Central on a weekday and same-day switching is usually available.

Compare Constellation plans in Granjeno

See how Constellation's 3 plans stack up at your real Granjeno usage.

No spam · It's free · Takes 60 seconds

How enrollment works

You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.