12 Month (No Min Usage Fee)
Rates as of July 2026 · verify on the EFL
- ✓ 30% green
Constellation in Aledo
Constellation has 3 plans live on the Oncor grid serving Aledo. Lowest rate 14.30¢/kWh.
Constellation in Aledo
What you actually pay in Aledo
Constellation's cheapest plan in Aledo is 14.3¢/kWh all-in. That number is two parts: Constellation's energy charge, plus the Oncor delivery charge — the cost of the poles and wires, set by the PUCT and identical on every plan from every provider on this grid.
At a typical 1,000 kWh month, that's about $143 — including the ~$3.42 Oncor meter charge. Because delivery is fixed, the only lever between providers in Aledo is the energy charge. Constellation's best rate ranks #12 of 18 providers on the Oncor grid.
Top Constellation picks for Aledo
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Rates as of July 2026 · verify on the EFL
Aledo, Parker County — population 6K, sample ZIP 76008. Served by Oncor (outage line: 1-888-313-4747).
Switching in Aledo
Oncor owns the wires in Aledo and processes the switch in 1-3 business days — no service interruption, no truck roll, no new equipment. Constellation files the switch on your behalf. Same-day if you order before 4-5 PM Central.
Constellation in Aledo — FAQ
More on Constellation
See how Constellation's 3 plans stack up at your real Aledo usage.
How enrollment works
You pick the plan here. Enrollment finishes on our secure checkout — same rate, no markup. If you'd rather skip the ZIP entry, Live Link pulls your real usage from Smart Meter Texas in about 30 seconds. Same plans, same checkout, less typing.